Every build begins
with a conversation.
We take on a limited number of commissions each year. That's what lets us design, specify, and build every detail ourselves, without shortcuts.
The commissioning journey.
Site Survey & Appraisal
Before a build begins, a surveyor visits your property to check ground conditions, electrical routing, and access. Those findings shape the final design.
Book a Site Appraisal →Design Configuration
Working closely with our design team, you will configure the sauna's proportions, timber finishes, and heat source. We provide detailed material samples and a final architectural rendering for your approval.
The Workshop Build
Your commission enters our Cheshire workshop. Over 14 to 18 weeks, our master carpenters construct your cabin from the ground up, employing precision joinery and applying the protective Shou Sugi Ban charring.
Delivery & Commissioning
The completed structure is transported to your site and craned carefully into position. Our senior installer completes the electrical integration, performs the final safety checks, and initiates the first firing.
Limited Production.
We maintain a strict quality ceiling by limiting our production run. This allows us to guarantee the structural integrity and aesthetic finish of every cabin we create.